The 77-hectare Eagle Mine Property is located several kilometres west of the former mining town of Joutel. The property is readily accessible by the same Highway 109 that runs through the JV's Douay Gold Project and connecting the towns of Amos and Matagami.
Figure 1: Plan view on regional geology base map showing location of the Eagle Mine claim along with additional target trends and >2 g/t Au results from drilling highlighted (red).
Figure 2: Completed Phase I (~4,500 m) and nearly completed Phase II (~4,000 m) drillholes at Eagle